1. Arrival of Pipe
2. Surface pre-heating
3. Shot Blast
4. High Pressured Air cleaning
5. High Frequency Heating
6. FBE Coating
7. Adhesive & PE(PP) Coating
8. Cooling
9. Pin Hole test
10. Quality Inspection
11. Cutback
12. Ready for Shipment or Stored